Water

Potable and recycled water transmission and distribution — pipe laying, live tie-ins, chambers, pumping stations and leak rectification, with staff individually certified for shutdowns up to DN560.

Water infrastructure demands a contractor who can cut into a live main without disrupting supply. Our civil engineers hold TAQA competency cards specifically for water network shutdowns and tie-ins — a credential that is checked, not claimed.

Capability at a glance

Tie-in capability
Up to DN560 on live mains
Utility work groups
Pipeline tie-ins to DN400 · house connections to DN200
Welding fleet
10 butt fusion · 9 electrofusion
Utility registration
TAQA Distribution · SWS

Scope of works

What we self-perform


  • Water transmission and distribution pipelines — ductile iron, HDPE and PVC, from service lines to trunk mains
  • Live network tie-ins, shutdowns, valve installation and system integration up to DN560
  • HDPE butt fusion and electrofusion welding with our own calibrated welding fleet
  • Valve chambers and thrust blocks — civil construction, waterproofing and reinstatement
  • Pumping stations — civil, mechanical, electrical and control systems, new build and refurbishment
  • Pressure testing, disinfection, flushing and commissioning to utility standards
  • House connections and meter installation up to DN200
  • Leak detection and rectification, including emergency response
  • Waterline diversion and relocation for road and development projects
  • Preventive and emergency maintenance programmes for distribution networks

On site

From the field


Portfolio

Projects in this division


KEZAD Area A, Phase 1E & 1F — infrastructure water works Ongoing

KEZAD Area A, Phase 1E & 1F — infrastructure water works

Water infrastructure works for the industrial zone's Phase 1E and 1F development, delivered as specialist sub-contractor to Desert Man Transporting & Contracting.

Client
AD Ports Group
Year
2026
Division
Water
Status
Ongoing
Contract value
AED 7.35 M
Qasr Al Sarab private villas, Phase 3 Completed

Qasr Al Sarab private villas, Phase 3

Electrical and potable water installations for a private villa development in the Liwa desert, closed out with a formal completion certificate from the main contractor.

Client
Trojan Construction Group
Year
2022
Division
Water
Status
Completed
Commercial Building C44 — 300 mm ductile iron water main Completed

Commercial Building C44 — 300 mm ductile iron water main

Supply and installation of a 300 mm ductile iron water main with associated LV cable relocation, including all utility and municipality permits.

Client
A&M International Contracting
Year
2021
Division
Water
Status
Completed
Contract value
AED 245,000